
The PCN Scheme has been undergoing a major review and relaunch following the issue of ISO 9712:2022. All new PCN24 Scheme documents are prefixed 'PCN24' and officially launch on 1 July 2024; however, there will be a phased introduction. Where new PCN24 documents have not yet been issued, the legacy documents should continue to be used.
Any concerns or queries should be forwarded to the Certification Services Department, which will endeavour to respond in good time:
Certification Manager: jennifer.cook@bindt.org
Technical enquiries: technical@bindt.org
PCN enquiries: pcn.enquiries@bindt.org
Audit enquiries: audits@bindt.org PCN24 – Document download – PSL
|
PCN24/PSL04 | Examination availability | Issue 03 | May 2025 |  |
PCN24/PSL18 | Application for a duplicate PCN certificate | Issue 01 | October 2024 | |
PCN24/PSL30 | Log of industrial NDT experience | Issue 01 | April 2025 | |
PCN24/PSL31 | Use of the accreditation mark, the PCN logo and reference to PCN | Issue 01 | March 2025 |  |
PCN24/PSL33 | Verification of photograph and signature supplied for PCN e-certification | Issue 01 | March 2025 |  |
PCN24/PSL35 | Charges for Certification Services for 2025 | Issue 01 | January 2025 |  |
PCN24/PSL49 | PCN examination exemptions | Issue 01 | February 2025 |  |
PCN24/PSL57C | Post-experience application: application for certification where experience is gained following examination | Issue 01 | April 2025 | |
PCN24/PSL60 | BINDT/PCN compliance with the Pressure Equipment (Safety) Regulations 2016: Guidance (GB) and European Pressure Equipment Directive 2014/68/EU | Issue 01 | March 2025 |  |
PCN24/PSL66 | BINDT-approved stamps for PCN certificate holders | Issue 01 | January 2025 |  |
PCN24 – Document download – CP
|
PCN24/CP14 | Conformity assessment of ATOs, AQBs and quality management systems | Issue 02 | Sept 2024 |  |
PCN24/CP16 | Renewal and recertification of PCN Level 1, 2 and 3 certificates A PCN24/CP16 FAQ can be found here.
| Issue 03 | June 2025 |  |
PCN24/CP19 | Informal access to BINDT Authorised Qualifying Bodies by third parties | Issue 01 | March 2025 |  |
PCN24/CP21 | Procedure for complaints, falsification, cheating and appeals | Issue 02 | March 2025 |  |
PCN24/CP27 | Code of Ethics for PCN certificate holders | Issue 01 | March 2025 |  |
PCN24 – Document download – General
|
PCN24/GEN | General requirements for qualification and PCN certification of NDT personnel | Issue 01 | January 2024 |  |
PCN24/GEN/AppendixZ1 | NDT examination syllabi | Issue 01 | February 2024 |  |
PCN24/GEN/APP/ET | PCN certification eligibility and examination requirements for personnel engaged in non-destructive testing using the electromagnetic testing (ET) method at Levels 1, 2 and 3 | Issue 01 | July 2024 |  |
PCN24/GEN/APP/MT | PCN certification eligibility and examination requirements for persons engaged in non-destructive testing (NDT) using the magnetic particle testing (MT) method at Levels 1, 2 and 3 | Issue 01 | January 2024 |  |
PCN24/GEN/APP/PT | PCN certification eligibility and examination requirements for persons engaged in non-destructive testing using the penetrant testing (PT) method at Levels 1, 2 and 3 | Issue 01 | January 2024 |  |
PCN24/GEN/APP/RT | PCN certification and examination eligibility requirements for personnel engaged in non-destructive testing using the radiographic testing (RT) method at Levels 1, 2 and 3 | Issue 01 | May 2024 |  |
PCN24/GEN/APP/UT | PCN certification eligibility and examination requirements for personnel engaged in non-destructive testing using the ultrasonic testing (UT) method at Levels 1, 2 and 3 | Issue 01 | January 2025 |  |
PCN24/GEN/APP/VT | PCN certification eligibility and examination requirements for persons engaged in non-destructive testing using the visual testing (VT) method at Levels 1, 2 and 3 | Issue 01 | January 2024 |  |
PCN24/GEN/APP/WI | Specific PCN requirements for the certification of personnel for weld inspection | Issue 01 | January 2025 |  |
PCN24/SYL/DOC/RUT | PCN training and examination syllabus document for: rail sector – Ultrasonic testing (RUT) rail track and rail axle testing at PCN Levels 1, 2 and 3 | Issue 01 | January 2025 |  |
PCN24/SYL/WI | PCN Syllabus – Welding inspection (WI) | Issue 01 | January 2025 |  |
|
PCN24 – Document download – Terms of Reference
|
PCN24/1 | Constitution, terms of reference and method of working of the Certification Management Committee | Issue 01 | January 2025 |  |
PCN24/2 | Constitution, terms of reference and method of working of an Industry Sector Method Working Group Committee | Issue 01 | January 2025 |  | |
PCN24/3 | Constitution, terms of reference and method of working of the PCN Scheme Certification Technical Committee | Issue 01 | January 2025 |  | |
PCN24/5 | Constitution, terms of reference and method of working of a BINDT certification/verification panel | Issue 01 | January 2025 |  | |
PCN24/9 | Constitution, terms of reference and method of working of the BINDT Outside Agency/Internal Agency Group (OA/IAG) | Issue 01 | January 2025 |  | |