UK NANDTB Documents

UK National Aerospace NDT Board 

Please note the change of address for the British Institute of Non-Destructive Testing, Midsummer House, Riverside Way, Bedford Road, Northampton NN1 5NX, United Kingdom. All documents will be amended as and when they are reviewed.


Document Control
The NANDTB Secretariat, which is provided by The British Institute of NDT, publishes and controls the documentation approved by the Board for publication. The following are the stages of the process:
  1. The Secretary drafts documents at the request of the Board, or receives drafts from members' nominees;
  2. Drafts are progressed through committee to final approval by the Board (no logo or issue date indicates draft in progress);
  3. Documents are published and distributed, recording status in this document;
  4. Documents are reviewed and revised after a defined period (document life), then
  5. Documents are resubmitted for approval by the Board (or the same body as originally approved the document).
Some documents have supporting powerpoint presentations and these can be found below the document in blue text.


Reference Title Issue date Revision Review date
NAndtB 01 NAndtB document control 04-04-2022
Issue 2 04-2025
NAndtB 02 NAndtB aims and objectives 05-09-2022 Issue 9 05-09-2025
NAndtB 03 NAndtB constitution 10-12-2019
Issue 8 10-12-2021
NAndtB 04 NAndtB terms of reference 28-02-2022 Issue 5  02-2025
NAndtB 05 NAndtB method of operation 15-04-2024 Issue 5 15-04-2027
NAndtB 06 List of NAndtB Board Members
15-04-2024 as dated n/a
NAndtB 09 Co-option to the membership of the UK NAndtB
15-04-2024 Issue 5 15-04-2027
NAndtB 10 Policy on recognition of PCN aerospace certificates 20-06-2017
Issue 2 20-06-2019
NAndtB_11
Promotional presentation
Withdrawn


NAndtB 12 Accreditation of training and examination agencies [see OAQS2 for register of agencies accredited] 20-04-2022 Issue 8
NAndtB_13
Review and approval of PCN aerospace sector examination papers
Withdrawn


NAndtB_14
Policy on training and approval of initial personnel in new NDT technologies 10-03-2015 reviewed on 26-02-2019 Issue 2 No change required when reviewed, to be looked at post spec 26-02-2021
NAndtB 14 New NDT technologies start up – Powerpoint presentation

– UNDER REVIEW


Withdrawn


NAndtB_15

Generic terms of reference for co-opted representatives – Superseded by NAndtB_09
Withdrawn


NAndtB 16 Essential information to be included on Qualifying agency training and examination reports and/or certificates 17-12-2018 Issue 8 17-12-2020
NAndtB 17 Limited Level 2 policy 11-09-2023 Issue 6
11-09-2036
NAndtB 18 NDT method or technique – training and certification guidance  05-12-2017 Issue 1 rev D
05-12-2019
NAndtB 19 Combined composites NDT personnel guidance 06-12-2016 Issue 4
06-12-2018
NAndtB_19 Combined composites NDT personnel guidance – Powerpoint presentation

– UNDER REVIEW

Withdrawn

NAndtB_20
Near vision requirements
Withdrawn


NAndtB_21 Overseas affiliations to the UK NAndtB –  Withdrawn 2015-06-19 – Please refer to AD010
Withdrawn


NAndtB_21 Overseas affiliations to the UK NAndtB – Powerpoint presentation –  Withdrawn 2015-06-19 – Please refer to AD010 Withdrawn

NAndtB_22  Use of the NANDTB logo 28-02-2022 Issue 5

NAndtB_23
UK NANDTB policy on certification of responsible Level 3's and certification of Level 3 personnel using the credit system in accordance with EN 4179
Reviewed on 20-06-2017
Issue 2
20-06-2019
NAndtB_23 UK NANDTB policy on Level 3 recertification by credit system IAW EN4179 – Powerpoint presentation Withdrawn

NAndtB_24 Near vision standard – Withdrawn – Superseded by ISO 18490


NAndtB_25
Training for administration of vision acuity test (unprotected PowerPoint file)
04-04-2022
Issue 5
01-2025
NAndtB_26
UK NAndtB frequently asked questions – with answers
09-12-2015 As dated
n/a
NAndtB_27 Qualification equivalencies for minimum experience requirements for Level 3
04-04-2022
 
Issue 403-2025
NAndtB_28
Record of suggested changes to next issue of EN4179
09-12-2017 Issue 3
n/a
NAndtB_28_A Record of all requests to EN4179:2021 for consideration by the harmonisation committee 04-04-2022Issue 1  
NAndtB_29 Policy on remote NDT 28-02-2022 Issue 1  
NAndtB_30 3D non-film radiographic testing training and qualification 05-09-2022 Issue 1 05-09-2024
Annual Reports 
Issue date
NANDTB2006
NANDTB 2006 Annual Report 31-12-2006
NANDTB2007
NANDTB 2007 Annual Report 31-12-2007
NANDTB2009
NANDTB 2009 Annual Report
14-12-2009
NANDTB2010
NANDTB 2010 Annual Report
04-05-2011
NANDTB2011
NANDTB 2011 Annual Report
01-02-2012
Minutes of meetings held
04/M1 NAndtB 04M1
04/M2 NAndtB 04M2
05/M1 NAndtB 05M1
05/M2 NAndtB 05M2
05/M3 NAndtB 05M3
05/M4 NAndtB 05M4
06/M1 NAndtB 06M1
06/M2 NAndtB 06M2
06/M3 NAndtB 06M3
06/M4 NAndtB 06M4
07/M1 NAndtB 07M1
07/M2 NAndtB 07M2
07/M3 NAndtB 07M3
07/M4 NAndtB 07M4
08/M1 NAndtB 08M1
08/M2 NAndtB 08M2
08/M3 NAndtB 08M3
08/M4 NAndtB 08M4
09/M1 NAndtB 09M1 – Belfast
09/M2 NAndtB 09M2 – Warton
09/M3 NAndtB 09M3 – Cardiff
09/M4 NAndtB 09M4 – Filton
10/M1 NAndtB 10M1 – Northampton
10/M2 NAndtB 10M2 – Belfast
10/M3 NAndtB 10M3 – Reigate
10/M4 NAndtB 10M4 – Cardiff 
10/M5 NAndtB 10M5 – Northampton
10/M6
NAndtB 10M6 – Filton
11/M1
NAndtB 11M1 – Northampton
11/M2
NAndtB 11M2 – Gatwick
11/M3
NAndtB 11M3 – Belfast
11/M4
NAndtB 11M4 – Reigate
11/M5
NAndtB 11M5 – London
11/M6
NAndtB 11M6 – Gloucester   
12/M1 NAndtB 12M1 – BINDT
12/M2 NAndtB 12M2 – Hayes
12/M3 NAndtB 12M3 – Belfast    
12/M4 NAndtB 12M4 – Caparo
12/M5 NAndtB 12M5 – BINDT   
12/M6 NAndtB 12M6 – Cardiff
13/M1
NAndtB 13M1 – Northampton
13/M2
NAndtB 13M2 – Glasgow
13/M3
NAndtB 13M3 – Newport
13/M4
NAndtB 13M4 – Northampton
13/M5
NAndtB 13M5 – Reigate
14/M1
NAndtB 14M1 – Reigate
14/M2
NAndtB 14M2 – Northampton
14/M3
NAndtB 14M3 – Portsmouth
14/M5
NAndtB 14M5 – Cardiff
15/M1
NAndtB 15M1 – Northampton
15/M2
NAndtB 15M2 – Exeter
15/M3
NAndtB 15M3 – Telford
15/M4
NAndtB 15M4 – Heathrow
16/M1
NAndtB 16M1 – Belfast
16/M2
NAndtB 16M2 – Sheffield
16/M3
NAndtB 16M3 – Nottingham
16/M4
NAndtB 16M4 – Brougton
17/M1
NAndtB 17M1 – Samlesbury (58th)
17/M2
NAndtB 17M2 – Belfast (59th)
17/M3
NAndtB 17M3 – Reigate (60th)
17/M4
NAndtB 17M4 – Cardiff (61st)
18/M1
NAndtB 18M1 – Northampton (62nd)
18/M2
NAndtB 18M2 – Exeter (63rd)
18/M3 NAndtB 18M3 – Belfast (64th) 
18/M4 NAndtB 18M4 – Cardiff (65th) 
19/M1 NAndtB 19M1 – Salmesbury (66th) 
19/M2
NAndtB 19M2 – Sheffield (67th)
19/M3 NAndtB 19M3 – Broughton (68th) 
19/M4 NAndtB 19M4 – Cardiff (69th) 
20/M1 NAndtB 20M1 – Northampton (70th) 
21/M1 NAndtB 21M1 – Virtual (71st) 
22/M2 NAndtB22M2 – Virtual (72nd)